Los Vaqueros Reservoir

Project: Los Vaqueros Reservoir, Contra Costa Water District

Date of Project: 1999-2000

Contact Person: Michael Warner

Survey Lead: John Rinehart, LIST

 

Description: His task was to survey approximately 8 miles of reservoir boundary and set 6-inch diameter by 30-inch long concrete monuments at all boundary corners.  A Record of Survey was then filed covering the area of survey.

Additional tasks included running 200 ft. minimum line points between boundary corners for fencing, writing of a legal description and preparation of plats for wetland mitigation areas.

Location

APEX Civil Engineering & Land Surveying
817 Arnold Dr., Suite 50,
Martinez, CA 94553
Phone: (925)476-8499
http://apexce.net