Project: Los Vaqueros Reservoir, Contra Costa Water District
Date of Project: 1999-2000
Contact Person: Michael Warner
Survey Lead: John Rinehart, LIST
Description: His task was to survey approximately 8 miles of reservoir boundary and set 6-inch diameter by 30-inch long concrete monuments at all boundary corners. A Record of Survey was then filed covering the area of survey.
Additional tasks included running 200 ft. minimum line points between boundary corners for fencing, writing of a legal description and preparation of plats for wetland mitigation areas.